Implementation of Thyristor controlled series capacitor in transmission system to improve the performance of power system network
Original price was: Rs6,500.00.Rs5,500.00Current price is: Rs5,500.00.
|
Description
Thyristor-controlled series capacitor (TCSC) is used to control the active power flow in transmission lines in the power system to specific values. The implementation of the TCSC in any power system for the reduction of the power transmission losses and increases the available capacity and improve the voltage profile. In this the TCSC is implemented in the 2 bus system and 14 bus system to improve the efficiency. This process is implemented in the MATLAB Simulink environment. By the usage of TCSC in the IEEE 14 bus and 2 bus system to improve the efficiency more than that of the normal IEEE 14 bus system. Finally these results show the effectiveness of the proposed TCSC.
Only logged in customers who have purchased this product may leave a review.
Reviews
There are no reviews yet.