Products in cart

ProductDetailsTotal
White-Box Traceable CP-ABE for Cloud Storage Service: How to Catch People Leaking Their Access Credentials Effectively
Service Level Agreement for Distributed Mutual Exclusion in Cloud Computing
Rs2,500.00
Rs2,500.00
Analysis and Design of an E-Band Transformer-Coupled Low-Noise Quadrature VCO in 28-nm CMOS
A 65 nm Cryptographic Processor for High Speed Pairing Computation
Rs3,500.00
Rs3,500.00
Fingerprint Matching Incorporating Ridge Features With Minutiae
Synthesizing ontology Alignment Methods Using the Max-Sum Algorithm
Rs2,500.00
Rs2,500.00
Data Mining Final Year Project Hyderabad
Data Mining Applications to Fault Diagnosis in Power Electronic Systems: A Systematic Review
Previous price:Rs6,500.00Discounted price:Rs5,500.00
Save Rs1,000.00
Rs5,500.00
Event-to-Sink Spectrum-Aware Clustering in Mobile Cognitive Radio Sensor Networks-Matlab
Pilot Allocation for Distributed-Compressed-Sensing-Based Sparse Channel Estimation in MIMO-OFDM Systems
Rs4,500.00
Rs4,500.00
Implementation of a High-Efficiency High-Lifetime and Low-Cost Converter for an Autonomous Photovoltaic Water Pumping System
A Capacitor Voltage-Balancing Method for Nested Neutral Point Clamped (NNPC) Inverter
Rs4,500.00
Rs4,500.00
Quaternion-Michelson Descriptor for Color Image Classification
Noninvasive Real-Time Automated Skin Lesion Analysis System for Melanoma Early Detection and Prevention
Rs3,500.00
Rs3,500.00
Scalable Algorithms for Nearest-Neighbor Joins on Big Trajectory Data
Detecting Malicious Facebook Applications JAVA
Rs4,500.00
Rs4,500.00

Cart totals

SubtotalRs31,000.00
9% CGSTRs2,790.00
9% SGSTRs2,790.00