LiveZilla Live Chat Software
Warning STRICT ERROR REPORTING IS ON

Delay Analysis of Multichannel Opportunistic Spectrum Access MAC Protocols

Delay Analysis of Multichannel Opportunistic Spectrum Access MAC Protocols

Starting at: Rs.4,500.00

4500 reward points

Delay Analysis of Multichannel Opportunistic Spectrum Access MAC Protocols

 We provide a comprehensive delay and queueing analysis for two baseline medium access control protocols for multi-user cognitive radio networks with homogeneous users and channels and investigate the impact of different network parameters on the system performance. In addition to an accurate Markov chain, which follows the queue status of all users, several lower complexity queueing theory approximations are provided. Accuracy and performance of the proposed analytical approximations are verified with extensive simulations. It is observed that using an Aloha-type access to the control channel, a buffering MAC protocol, where in case of interruption the CR user waits for the primary user to vacate the channel before resuming the transmission, outperforms a switching MAC protocol, where the CR user vacates the channel in case of appearance of primary users and then compete again to gain access to a new channel. The reason is that the delay bottleneck for both protocols is the time required to successfully access the control channel, which occurs more frequently for the switching MAC protocol. It is thus shown that a clustering approach, where users are divided into clusters with a separate control channel per cluster, can significantly improve the performance by reducing the competitions over control channel.


 


ClickMyProject Specifications
 
 
Including Packages
 
Specialization
 
  * Supporting Softwares   * 24/7 Support
  * Complete Source Code   * Ticketing System
  * Complete Documentation   * Voice Conference
  * Complete Presentation Slides   * Video On Demand *
  * Flow Diagram   * Remote Connectivity *
  * Database File   * Code Customization **
  * Screenshots   * Document Customization **
  * Execution Procedure   * Live Chat Support
  * Readme File   * Toll Free Support *
  * Addons    
  * Video Tutorials    
       
 

*- PremiumSupport Service (Based on Service Hours) ** - Premium Development Service (Based on Requirements)


Add to Cart:

  • Model: PROJ5193
  • 999 Units in Stock
  • Manufactured by: ClickMyProjects

Please Choose:

Downloadable







This product was added to our catalog on Tuesday 13 September, 2016.

  0