LiveZilla Live Chat Software
Warning STRICT ERROR REPORTING IS ON
Economic Dispatch of Power Systems with Virtual Power Plant Based Interval Optimization Method

Economic Dispatch of Power Systems with Virtual Power Plant Based Interval Optimization Method

Starting at: Rs.5,500.00

5500 reward points

 Economic Dispatch of Power Systems with Virtual Power Plant Based Interval Optimization Method

 Load prediction and power prediction uncertainties are inevitable aspects of a virtual power plant (VPP). In power system economic dispatch (ED) modeling, the interval is used to describe prediction uncertainties. An ED model with interval uncertainty is established in this paper. The probability degree definition is adopted to convert the interval-based economic dispatch model into a deterministic model for the purposes of solving the modeling problem.


 


ClickMyProject Specifications
 
 
Including Packages
 
Specialization
 
  * Supporting Softwares   * 24/7 Support
  * Complete Source Code   * Ticketing System
  * Complete Documentation   * Voice Conference
  * Complete Presentation Slides   * Video On Demand *
  * Flow Diagram   * Remote Connectivity *
  * Database File   * Code Customization **
  * Screenshots   * Document Customization **
  * Execution Procedure   * Live Chat Support
  * Readme File   * Toll Free Support *
  * Addons    
  * Video Tutorials    
       
 

*- PremiumSupport Service (Based on Service Hours) ** - Premium Development Service (Based on Requirements)


Add to Cart:

  • Model: PROJ7132
  • 999 Units in Stock
  • Manufactured by: ClickMyProjects

Please Choose:

Downloadable







This product was added to our catalog on Wednesday 07 June, 2017.

  0