LiveZilla Live Chat Software
Warning STRICT ERROR REPORTING IS ON
Congestion management using demand response and FACTS devices

Congestion management using demand response and FACTS devices

Starting at: Rs.4,500.00

4500 reward points

Congestion management using demand response and FACTS devices

 An approach is proposed for transmission lines congestion management in a restructured market environment using a combination of demand response (DR) and flexible alternating current transmission system (FACTS) devices. To achieve this aim, a two-step market clearing procedure is formulated. In the first step, generation companies bid to the market for maximizing their profit, and the ISO clears the market based on social welfare maximization. Network constraints including those related to congestion management are represented in the second step of the market-clearing procedure. The paper develops, using mixed integer optimization technique, a re-dispatch formulation for the second step in which demand responses and FACTS device controllers are optimally coordinated with conventional generators.


 


ClickMyProject Specifications
 
 
Including Packages
 
Specialization
 
  * Supporting Softwares   * 24/7 Support
  * Complete Source Code   * Ticketing System
  * Complete Documentation   * Voice Conference
  * Complete Presentation Slides   * Video On Demand *
  * Flow Diagram   * Remote Connectivity *
  * Database File   * Code Customization **
  * Screenshots   * Document Customization **
  * Execution Procedure   * Live Chat Support
  * Readme File   * Toll Free Support *
  * Addons    
  * Video Tutorials    
       
 

*- PremiumSupport Service (Based on Service Hours) ** - Premium Development Service (Based on Requirements)


Add to Cart:

  • Model: PROJ5633
  • 999 Units in Stock
  • Manufactured by: ClickMyProjects

Please Choose:

Downloadable







This product was added to our catalog on Friday 07 October, 2016.

  0